Architect
|
J,W. Hodges, Generation development and
construction division, CEGB.
|
|
|
|
Quantity surveyors
|
Inman & Partners.
|
|
|
|
Electrical, heaters and
ventilating consultants
|
EDC London.
|
|
|
|
Main contractor
|
Thomas Lowe & Sons, Burton-upon-Trent,
Staffs.
|
|
|
|
Electrical sub-contractor
|
Drake & Skull Ltd.
|
|
|
|
Construction
|
Steel frame erected by Stephensons, Norwich.
|
|
|
|
Heating and ventilating
|
Electric warm air system by Woods of
Colchester.
|
|
|
|
Heating and ventilating controls
|
Drayton Controls Ltd.
|
|
|
|
Electrical switchgear
|
MEM Electrical Ltd.
|
|
|
|
Overhead crane
|
Alien & Co. Ltd.
|
|
|
|
Compressed air services
|
Broom & Wade, High Wycornbe.
|
|
|
|
Total area
|
3,132 Sq. Metres
|
|
|
|
Total electrical load
|
1.2 MW
|
|
|
|
Total cost
|
£345,000
|
Checking for a fault in
an amplifier - the total
value of the plant
training centre's
equipment is nearly
£140,000.
|
|
|
Cost of building
|
£268,000
|
|
|
|
Cost of equipment
|
£77,000
|
|
|
|
Additional equipment
|
Scrap, redundant and unserviceable items
acquired from power stations.
Estimated value £60,000.
|
|
|
|